G2TT

浏览/检索结果: 共2条,第1-2条 帮助

已选(0)清除 条数/页:   排序方式:
Getting New Coal-fired Power Plants Ready for Carbon Capture and Storage in China by the Concept of Issuing Options 智库出版物
2009
作者:  Liang;  X.;  Reiner;  D.;  Gibbins;  J.;  Li;  J.
收藏  |  浏览/下载:0/0  |  提交时间:2019/11/14
Assessing the Value of Capture Ready in New-built Coal Fired Power Plants in China, Proceedings, GHGT9: 9th International Conference on Greenhouse Gas Technologies, Washington, D.C. 智库出版物
2008
作者:  Liang;  Xi;  DM Reiner;  J. Gibbins
收藏  |  浏览/下载:1/0  |  提交时间:2019/11/14