Gateway to Think Tanks
来源类型 | Article |
规范类型 | 其他 |
DOI | 10.1061/(ASCE)0733-9496(1984)110:4(403) |
Salt Gradient Ponds: Investment Timing Model. | |
Hughes TC; Orlovsky S | |
发表日期 | 1984 |
出处 | Journal of Water Resources Planning and Management 110 (4): 403-417 |
出版年 | 1984 |
语种 | 英语 |
摘要 | Salt gradient solar ponds can play an important role in management of river salinity in semiarid locations such as the Colorado River Basin. A mathematical model and solution procedure are presented for investment timing of expansion of a salt gradient pond system. An application of the model is presented for several sites in the upper Colorado River basin where planned fossil fuel electric generating plants are located near existing source of saline or brackish water. The concept involves use of both concentrated brine waste streams from the power plants and the existing low quality water sources for the pond system water and salt demands. The salt gradient pond can: (1) Replace a power plant's customary zero discharge evaporation; (2) produce additional energy; and (3) remove much more salt from the river system than the conventional evaporation pond. An economic model solution procedure and application are presented for expansion of salt gradient solar pond systems. Such systems have important potential for salinity management applications, when used in conjunction with thermal/electric plants near sources of saline water. |
URL | http://pure.iiasa.ac.at/id/eprint/13687/ |
来源智库 | International Institute for Applied Systems Analysis (Austria) |
引用统计 | |
资源类型 | 智库出版物 |
条目标识符 | http://119.78.100.153/handle/2XGU8XDN/126878 |
推荐引用方式 GB/T 7714 | Hughes TC,Orlovsky S. Salt Gradient Ponds: Investment Timing Model.. 1984. |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[Hughes TC]的文章 |
[Orlovsky S]的文章 |
百度学术 |
百度学术中相似的文章 |
[Hughes TC]的文章 |
[Orlovsky S]的文章 |
必应学术 |
必应学术中相似的文章 |
[Hughes TC]的文章 |
[Orlovsky S]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。