Gateway to Think Tanks
来源类型 | Article |
规范类型 | 其他 |
DOI | 10.1016/0377-2217(94)90353-0 |
DSS for multiobjective project scheduling. | |
Slowinski R; Soniewicki B; Weglarz J | |
发表日期 | 1994 |
出处 | European Journal of Operational Research 79 (2): 220-229 |
出版年 | 1994 |
语种 | 英语 |
摘要 | The paper presents a decision support system (DSS) for multiobjective project scheduling under multiple-category resource constraints. It handles quite a general class of nonpreemptive scheduling problems with renewable, nonrenewable and doubly-constrained resources, multiple performing modes of activities, precedence constraints in the form of an activity network and multiple project performance criteria of time and cost type. The DSS is based on three kinds of heuristics: parallel priority rules, simulated annealing and branch-and-bound. The last algorithm can even yield exact solutions when sufficient processing time is available. Some parts of the system are interactive, in particular, the search for the best compromise schedule. Graphical facilities enable a thorough evaluation of feasible schedules. Methodological foundations of the system and the algorithms used in the calculation phase are first explained. Then, a functional description of the system is made. The last part presents results of three test problems, in particular, an agricultural problem including 30 activities, multiple objectives and multiple-category resources. |
主题 | Methodology of Decision Analysis (MDA) |
关键词 | Decision support systems Project scheduling Multiple objectives Interactive method Simulated annealing Agricultural project |
URL | http://pure.iiasa.ac.at/id/eprint/3873/ |
来源智库 | International Institute for Applied Systems Analysis (Austria) |
引用统计 | |
资源类型 | 智库出版物 |
条目标识符 | http://119.78.100.153/handle/2XGU8XDN/127264 |
推荐引用方式 GB/T 7714 | Slowinski R,Soniewicki B,Weglarz J. DSS for multiobjective project scheduling.. 1994. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。