A network flow algorithm for just-in-time project scheduling.
Levner EV; Nemirovsky AS
发表日期1994
出处European Journal of Operational Research 79 (2): 167-175
出版年1994
语种英语
摘要We consider a project scheduling problem with the objective being a piecewise-linear, convex (possibly, non-monotone) function of the job durations as well as of job start/finish times. A version of ‘out-of-kilter’ algorithm of pseudo-linear complexity to handle this problem is provided.
主题Methodology of Decision Analysis (MDA)
关键词Project scheduling Just-in-time scheduling Out-of-kilter method Pseudo-polynomial algorithm
URLhttp://pure.iiasa.ac.at/id/eprint/3883/
来源智库International Institute for Applied Systems Analysis (Austria)
引用统计
资源类型智库出版物
条目标识符http://119.78.100.153/handle/2XGU8XDN/127273
推荐引用方式
GB/T 7714
Levner EV,Nemirovsky AS. A network flow algorithm for just-in-time project scheduling.. 1994.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Levner EV]的文章
[Nemirovsky AS]的文章
百度学术
百度学术中相似的文章
[Levner EV]的文章
[Nemirovsky AS]的文章
必应学术
必应学术中相似的文章
[Levner EV]的文章
[Nemirovsky AS]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。