G2TT
来源类型Article
规范类型其他
DOI10.1007/s12667-013-0112-2
Upgrading hydropower plants with storage: Timing and capacity choice.
Andersson AM; Elverhoi M; Fleten S-E; Fuss S; Szolgayova J; Troland OC
发表日期2014
出处Energy Systems 5 (2): 233-252
出版年2014
语种英语
摘要This paper presents an investment decision support framework for a hydropower producer with storage facilities that is considering upgrading the production capacity in its power plant. A real options framework is proposed to support the investment decision, where both investment timing and capacity choice are considered. Using a case from a Norwegian hydropower producer, we employ the framework to evaluate investment opportunities in this company. Our main contribution is an approach that combines hydropower scheduling and real options valuation for already constructed power plants. Furthermore, the results from our case analysis suggest feasible investment strategies or the hydropower producer.
主题Ecosystems Services and Management (ESM)
关键词Real options Electricity price uncertainty Upgrading Refurbishment Timing Capacity choice
URLhttp://pure.iiasa.ac.at/id/eprint/10917/
来源智库International Institute for Applied Systems Analysis (Austria)
引用统计
资源类型智库出版物
条目标识符http://119.78.100.153/handle/2XGU8XDN/130041
推荐引用方式
GB/T 7714
Andersson AM,Elverhoi M,Fleten S-E,et al. Upgrading hydropower plants with storage: Timing and capacity choice.. 2014.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Andersson AM]的文章
[Elverhoi M]的文章
[Fleten S-E]的文章
百度学术
百度学术中相似的文章
[Andersson AM]的文章
[Elverhoi M]的文章
[Fleten S-E]的文章
必应学术
必应学术中相似的文章
[Andersson AM]的文章
[Elverhoi M]的文章
[Fleten S-E]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。