概述What progress have EU Member States made in implementing the Water Framework Directive between the first (2009) to the second cycle (2015) of river basin management planning? A consultant's report co-authored by Ecologic Institute is provides initial insights on the basis of a screening assessment of the second River Basin Management Plans draft, prepared for the fourth European Water Conference. The report is available for download.
摘要class="field field-name-field-master-image field-type-image field-label-hidden">

What progress have EU Member States made in implementing the Water Framework Directive between the first (2009) to the second cycle (2015) of river basin management planning? A consultant's report co-authored by Ecologic Institute is provides initial insights on the basis of a screening assessment of the second River Basin Management Plans draft, prepared for the fourth European Water Conference. The report is available for download.

The main focus of the 4th European Water Conference (23-24 March 2015, Brussels) was on lessons learned from the 1st Water Framework Directive (WFD) planning cycle, expectations for the 2nd planning cycle as well as on experiences in implementing the Floods Directive. The timing of the Conference coincided with the public consultations of the Member States on the draft 2nd River Basin Management Plans (RBMPs) and (some of) the draft Flood Risk Management Plans.

The aim of this consultant's report co-authored by Ecologic institute has been to sketch progress made from the 1st to the 2nd cycle RBMPs with respect to the European Commission's recommendations to Member States as outlined in the 4th implementation report on progress in implementation of the WFD Programme of Measures. The Commission's recommendations aim to assist Member States in identifying the areas where improvement in the implementation of the WFD is needed and expected as a matter of priority. This report outlines to which extent the recommendations have been implemented within selected draft 2nd RBMPs, the content of which has been screened for the purpose of this assessment. The results presented are not a "final" assessment but a first informal overview; they show the progress made but do not allow a ranking of RBMPs.
目录Table of Contents: 1. Executive Summary2. Introduction and Background3. Framework for Screening Assessment 3.1 Methodology 3.2 Selection of RBDs for screening 3.3 Limitations of the screening exercise 3.4 Structure of this report 4. Assessment of Draft Second River Basin Management Plans 4.1 Some key statistics from the draft second RBMPs 4.2 Progress on expectations from the first cycle 4.3 Characterisation of the River Basin District 4.4 Monitoring and status assessment 4.5 Designation of Heavily Modified Water Bodies and definition of Good Ecological Potential 4.6 Objective setting and exemptions 4.7 Economic analysis 4.8 Programme of measures
标签Report ; Policy Assessment ; Water
关键词river basin management planning Water Framework Directive WFD 2nd planning cycle water programme of measures Europe
URLhttps://www.ecologic.eu/11983
来源智库Ecologic Institute (Germany)
资源类型智库出版物
条目标识符http://119.78.100.153/handle/2XGU8XDN/36619
推荐引用方式
GB/T 7714
Dr. Eleftheria Kampa. Screening Assessment of Draft Second Cycle River Basin Management Plans. 2015.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Dr. Eleftheria Kampa]的文章
百度学术
百度学术中相似的文章
[Dr. Eleftheria Kampa]的文章
必应学术
必应学术中相似的文章
[Dr. Eleftheria Kampa]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。