G2TT
来源类型Report
规范类型报告
来源IDRR-767-AUS
Keeping Major Naval Ship Acquisitions on Course: Key Considerations for Managing Australia's SEA 5000 Future Frigate Program
John F. Schank; Mark V. Arena; Kristy N. Kamarck; Gordon T. Lee; John Birkler; Robert Murphy; Roger Lough
发表日期2014-12-22
出版年2014
语种英语
结论

Three Design and Build Options Are Available

  • The first option is a new design, essentially designing from scratch. This option would be designed and tailor-made to Royal Australian Navy specifications and requirements.
  • Another option is called military off-the-shelf (MOTS), which entails acquiring an existing ship design from an Australian or foreign ship producer and making only minor modifications to the design.
  • The last option is an evolved MOTS, which also entails acquiring an existing ship design from an Australian or foreign ship producer but making significant modifications to the design.
摘要

This study provides a program overview of acquisition options available for the Commonwealth of Australia's next generation naval surface combatant and identifies internal and external factors that can influence a major ship acquisition program. The authors address questions relating to available ship design and build options; various phases, options, and decisions; and aspects that can contribute to the success of an acquisition program. Three broad options for designing and building the new ship include a new design, tailor-made to Royal Australian Navy specifications and requirements; a military off-the-shelf design, which would involve making only minor modifications to an existing ship design; and an evolved military off-the-shelf design, which would involve making more significant modifications to an existing ship design. The authors discuss lessons learned as they apply to different phases of a shipbuilding program and highlight the lessons most applicable to the acquisition strategy selected.

目录
  • Chapter One

    Introduction

  • Chapter Two

    Establishing and Supporting a Program

  • Chapter Three

    SEA 5000 Acquisition Options

  • Chapter Four

    Overview of a Naval Shipbuilding Program

  • Chapter Five

    Acquisition and Contracting Strategy

  • Chapter Six

    The Solutions Analysis Phase

  • Chapter Seven

    Design Activities

  • Chapter Eight

    Manufacturing and Build

  • Chapter Nine

    Test and Trials

  • Chapter Ten

    Operations and Support

  • Chapter Eleven

    Summary Comments

  • Appendix A

    Overview of Recent Shipbuilding Programs in Australia, the United States, and the United Kingdom

  • Appendix B

    Technology Readiness Levels

  • Appendix C

    Best Practices in Scheduling

主题Australia ; Military Acquisition and Procurement ; Military Ships and Naval Vessels
URLhttps://www.rand.org/pubs/research_reports/RR767.html
来源智库RAND Corporation (United States)
资源类型智库出版物
条目标识符http://119.78.100.153/handle/2XGU8XDN/522642
推荐引用方式
GB/T 7714
John F. Schank,Mark V. Arena,Kristy N. Kamarck,et al. Keeping Major Naval Ship Acquisitions on Course: Key Considerations for Managing Australia's SEA 5000 Future Frigate Program. 2014.
条目包含的文件
文件名称/大小 资源类型 版本类型 开放类型 使用许可
RAND_RR767.pdf(1069KB)智库出版物 限制开放CC BY-NC-SA浏览
x1495316212997.jpg.p(7KB)智库出版物 限制开放CC BY-NC-SA浏览
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[John F. Schank]的文章
[Mark V. Arena]的文章
[Kristy N. Kamarck]的文章
百度学术
百度学术中相似的文章
[John F. Schank]的文章
[Mark V. Arena]的文章
[Kristy N. Kamarck]的文章
必应学术
必应学术中相似的文章
[John F. Schank]的文章
[Mark V. Arena]的文章
[Kristy N. Kamarck]的文章
相关权益政策
暂无数据
收藏/分享
文件名: RAND_RR767.pdf
格式: Adobe PDF
文件名: x1495316212997.jpg.pagespeed.ic.7SamuCMURG.jpg
格式: JPEG

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。