Gateway to Think Tanks
来源类型 | Working Paper |
规范类型 | 报告 |
DOI | 10.3386/t0211 |
来源ID | Technical Working Paper 0211 |
Time-to-Build and Cycles | |
Patrick K. Asea; Paul J. Zak | |
发表日期 | 1997-05-01 |
出版年 | 1997 |
语种 | 英语 |
摘要 | We analyze the dynamics of a simple growth model in which production occurs with a delay while new capital is installed (time-to-build). The time-to-build technology is shown to yield a system of functional (delay) differential equations with a unique steady state. We demonstrate that the steady state, though typically a saddle, may exhibit Hopf cycles on a measurable set of the parameter space. Furthermore, the optimal path to the steady state is oscillatory. A counter-example to the claim that intrinsically oscillatory on the central technical apparatus the mathematics of functional differential equations. |
主题 | Macroeconomics ; Business Cycles ; Microeconomics ; Mathematical Tools |
URL | https://www.nber.org/papers/t0211 |
来源智库 | National Bureau of Economic Research (United States) |
引用统计 | |
资源类型 | 智库出版物 |
条目标识符 | http://119.78.100.153/handle/2XGU8XDN/563528 |
推荐引用方式 GB/T 7714 | Patrick K. Asea,Paul J. Zak. Time-to-Build and Cycles. 1997. |
条目包含的文件 | ||||||
文件名称/大小 | 资源类型 | 版本类型 | 开放类型 | 使用许可 | ||
t0211.pdf(737KB) | 智库出版物 | 限制开放 | CC BY-NC-SA | 浏览 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[Patrick K. Asea]的文章 |
[Paul J. Zak]的文章 |
百度学术 |
百度学术中相似的文章 |
[Patrick K. Asea]的文章 |
[Paul J. Zak]的文章 |
必应学术 |
必应学术中相似的文章 |
[Patrick K. Asea]的文章 |
[Paul J. Zak]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。