Missing the 23 Per Cent Target: Roadblocks to the development of renewable energy in Indonesia
RIchard Bridle; Philip Gass; Aidy Halimajaya; Lucky Lontoh; Neil McCulloch; Erica Petrofsky; Lourdes Sanchez
发表日期2018-02
出版者IISD
出版年2018
页码41
语种英语
概述This report seeks to answer the question of why renewable energy deployment, particularly wind and solar, has not taken off in Indonesia. To understand the forces shaping the sector, and what can be done to remedy the situation, IISD conducted interviews with politicians, civil servants, industry representatives, renewable energy developers, civil society organizations, international donors and other stakeholders. A total of 26 interviews took place, revealing the roots of the problem, the broader political economy of the energy sector and some possible ways forward.
摘要

On January 25, 2017, Indonesian Minister of Energy and Mineral Resources (ESDM) Ignasius Jonan stated, “Indonesia is resolved to increasing its new and renewable energy mix to 23 per cent in 2025 in line with its commitment to reducing its greenhouse gas emissions it had made during the COP 21 conference in Paris in 2015.”

The commitment to increase renewable energy was made as part of a package of measures to tackle climate change in Indonesia’s Nationally Determined Contribution (NDC) that pledged to reduce emissions by 26 per cent against the business-as-usual scenario by 2020 and 41 per cent if international support is granted.

With this high-level commitment to a marked expansion of renewable energy—together with the international context of falling renewable energy prices—one might expect that renewable energy in Indonesia would be booming. However, since 2007 most of the increase in electricity production has come from coal and the share of renewable electricity production has remained relatively static, at around 12 per cent of total generation.

Between 2007 and 2016 hydro and geothermal capacity increased by 39 and 67 per cent respectively. But overall installations pale in comparison to coal, while solar remains almost nonexistent (45 MW total).

This report seeks to answer the question of why renewable energy deployment, particularly wind and solar, has not taken off in Indonesia. To understand the forces shaping the sector, and what can be done to remedy the situation, IISD conducted interviews with politicians, civil servants, industry representatives, renewable energy developers, civil society organizations, international donors and other stakeholders. A total of 26 interviews took place, revealing the roots of the problem, the broader political economy of the energy sector and some possible ways forward.

主题Subsidies
URLhttps://www.iisd.org/library/missing-23-cent-target-roadblocks-development-renewable-energy-indonesia
来源智库International Institute for Sustainable Development (Canada)
资源类型智库出版物
条目标识符http://119.78.100.153/handle/2XGU8XDN/56457
推荐引用方式
GB/T 7714
RIchard Bridle,Philip Gass,Aidy Halimajaya,et al. Missing the 23 Per Cent Target: Roadblocks to the development of renewable energy in Indonesia. 2018.
条目包含的文件
文件名称/大小 资源类型 版本类型 开放类型 使用许可
roadblocks-indonesia(39KB)智库出版物 限制开放CC BY-NC-SA浏览
roadblocks-indonesia(1077KB)智库出版物 限制开放CC BY-NC-SA浏览
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[RIchard Bridle]的文章
[Philip Gass]的文章
[Aidy Halimajaya]的文章
百度学术
百度学术中相似的文章
[RIchard Bridle]的文章
[Philip Gass]的文章
[Aidy Halimajaya]的文章
必应学术
必应学术中相似的文章
[RIchard Bridle]的文章
[Philip Gass]的文章
[Aidy Halimajaya]的文章
相关权益政策
暂无数据
收藏/分享
文件名: roadblocks-indonesia-renewable-energy-1.jpg
格式: JPEG
文件名: roadblocks-indonesia-renewable-energy.pdf
格式: Adobe PDF

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。