G2TT

浏览/检索结果: 共5条,第1-5条 帮助

已选(0)清除 条数/页:   排序方式:
Investing in Photovoltaics: Timing, Plant Sizing and Smart Grids Flexibility 智库出版物
2016
作者:  Marina Bertolini;  Chiara D'Alpaos;  Michele Moretto
JPEG(71Kb)  |  收藏  |  浏览/下载:1/0  |  提交时间:2019/06/14
Smart Grids  Renewable Energy Sources  Real Options  Prosumer  
Time Overruns as Opportunistic Behavior in Public Procurement 智库出版物
2012
作者:  Chiara D’Alpaos;  Michele Moretto;  Paola Valbonesi;  Sergio Vergalli
JPEG(71Kb)  |  收藏  |  浏览/下载:0/0  |  提交时间:2019/06/14
Strategic Time Overruns  Public Procurement  Real Options  
It Is Never too Late: Optimal Penalty for Investment Delay in Italian Public Procurement Contracts 智库出版物
2009
作者:  Chiara D’Alpaos;  Michele Moretto;  Paola Valbonesi;  Sergio Vergalli
JPEG(71Kb)  |  收藏  |  浏览/下载:2/0  |  提交时间:2019/06/14
Public Procurement Contracts  Penalty Fee  Investment Timing Flexibility  Contract Incompleteness  Enforceability of Rules  
Concession Length and Investment Timing Flexibility 智库出版物
2005
作者:  Michele Moretto;  Chiara D. Alpaos;  Cesare Dosi
Adobe PDF(491Kb)  |  收藏  |  浏览/下载:0/0  |  提交时间:2019/06/14
Concession contracts,Real option theory,Investment timing flexibility,Water utilities  
The Value of Flexibility in the Italian Water Service Sector: A Real Option Analysis 智库出版物
2004
作者:  Michele Moretto;  Chiara D'Alpaos
Adobe PDF(973Kb)  |  收藏  |  浏览/下载:0/0  |  提交时间:2019/06/14
Irreversible investment,Flexibility to defer,Capacity expansion choice